Generalpipeservices
Generalpipeservices
  • Home
  • Contact us
  • Prefab Services
  • About Us
  • Recent Projects
  • News
  • More
    • Home
    • Contact us
    • Prefab Services
    • About Us
    • Recent Projects
    • News
  • Home
  • Contact us
  • Prefab Services
  • About Us
  • Recent Projects
  • News
pipework pipe prefabricated module modulated General Pipe Services Limited

Steel Pipe Prefabrication

Procedure in accordance with BS EN ISO 15614-1:2004 and all welders are coded to

BS EN 287-1 2004 Class One.

Pipework prefabrication can be produced from the smallest of pipe sizes through to the largest and to the standard class I or Class II dependant upon your specification requirements.

Prefabrication can be produced from your drawings/sketches or we can offer our on

site measuring service

The following additional services can be opted for:

• Weld maps

• Ultra sonic testing at our works or sent away for radiographic testing

• Weld tagging

• Specialist paint coverings

All Pipework capped before transit if requested

pipework pipe prefabricated module modulated General Pipe Services Limited welding welded pipe
pipework pipe prefabricated module modulated General Pipe Services Limited welding welded pipe

Key Benefits

  • Low costs 
  • Production of all prefabrication can be made in advance and delivered in quantities as requested by the client
  • Low labour levels on site
  • Quality checked in advance
  • Faster Construction Process 
  • Reduction in Waste 
  • Minimizes Disruptions on Site 
  • Proven to reduce injuries on site

  • Contact us
  • Prefab Services
  • About Us
  • Recent Projects
  • News

General Pipe Services Ltd

Copyright © 2022 General Pipe Services - All Rights Reserved.

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept